DCIM100MEDIADJI_0939.JPG

Zhejiang Racing Circuit – Construction Update

November 12, 2015

 

The circuit and its associated buildings are now starting to rise from the ground and construction is moving at a furious pace.

Shown here in the images are all the concrete and steel works that are being used in the construction of the high end facilities that will adorn this World Class race circuit.

In parallel with these construction works Apex are currently preparing documentation pertaining to the site wide electronics for tender and undertaking regular visits to the site to supervise construction and ongoing design work.